Skip the field book

Frost note

Marion frost turns brick into board.

A board has no silt. A board has bounce.

January is a drumhead. Powder skates. Every player looks like they need an east correction. Rhea writes a winter rest instead of a new pin, then books April on the silt pan.

Back to towpath notes

Path Rail

A NewBo survey loft that stakes swing path as a string-line: in-to-out as an east bearing, out-to-in as a river bearing, never as a box arrow.

(319) 555-0141

Field desk

Path Rail
200 1st St SE, Suite 5
Cedar Rapids, IA 52401

desk@pathrail.shop

Yard hours

  • Sundayyard cold
  • Monday6:30 AM – 4:00 PM
  • Tuesday6:30 AM – 4:00 PM
  • Wednesday6:30 AM – 4:00 PM
  • Thursday6:30 AM – 4:00 PM
  • Friday6:30 AM – 3:00 PM
  • Saturdayyard cold

Pin index

Path Rail · Cedar Rapids · chain opened 2008

200 1st St SE, Suite 5 · Cedar Rapids · IA 52401